Project:Revamping of the TEF Plant
Client:TOTAL AUSTRAL S.A.
Location:Tierra del Fuego Province, ARGENTINA

Description:

Engineering review, assembly and interconnection of a dehydration tower, an exchanger and a Cold Box with all its associated civil, structural, mechanical, electrical and instrumentation facilities.

Special Characteristics: The construction works were carried out while the plant was shut down with a tight work schedule.

Execution Period:: August 2005 - January 2006