{"id":1452,"date":"2024-09-16T17:10:24","date_gmt":"2024-09-16T17:10:24","guid":{"rendered":"https:\/\/contreras.artfosdev.com\/?p=1452"},"modified":"2026-10-20T14:37:01","modified_gmt":"2026-10-20T14:37:01","slug":"montaje-de-facilidades-de-pads-fortin-de-piedra","status":"publish","type":"post","link":"https:\/\/contreras.artfosdev.com\/en\/montaje-de-facilidades-de-pads-fortin-de-piedra\/","title":{"rendered":"Assembly of PAD Facilities at Fort\u00edn de Piedra"},"content":{"rendered":"<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Project:<\/strong><\/td><td>Assembly of PAD Facilities at Fort\u00edn de Piedra<\/td><\/tr><tr><td><strong>Client:<\/strong><\/td><td>TECPETROL S.A.<\/td><\/tr><tr><td><strong>Location:<\/strong><\/td><td>Neuqu\u00e9n, ARGENTINA<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Description<\/strong>:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The scope of work includes the construction and assembly of: buried PAD facilities (pipelines between wells and heaters); PAD panels: Installation of electrical panels, instrument panels, radio, Wi-Fi system, CCTV system, lightning protection system, concrete base for electrical panels, removable fencing, and battery room; communication post: Installation of a 12-meter high steel post, aerial PAD facilities (assembly of heaters, instrument gas separator, well manifold, civil works, assembly of piping and electrical conduits).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Execution Period:<\/strong>April 2019 \u2013 August 2019<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Proyecto: Montaje de Facilidades de PADs Fort\u00edn de Piedra Cliente: TECPETROL S.A. Localizaci\u00f3n: Neuqu\u00e9n, ARGENTINA Descripci\u00f3n: El alcance de los [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1419,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-1452","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-servicios-y-mantenimientos-en-areas-petroleras"],"_links":{"self":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts\/1452","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/comments?post=1452"}],"version-history":[{"count":2,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts\/1452\/revisions"}],"predecessor-version":[{"id":1457,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts\/1452\/revisions\/1457"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/media\/1419"}],"wp:attachment":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/media?parent=1452"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/categories?post=1452"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/tags?post=1452"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}