{"id":1613,"date":"2026-04-10T18:08:13","date_gmt":"2026-04-10T18:08:13","guid":{"rendered":"https:\/\/contreras.artfosdev.com\/?p=1613"},"modified":"2026-10-20T14:36:58","modified_gmt":"2026-10-20T14:36:58","slug":"cpf-interconnecting-services-sourcing-package","status":"publish","type":"post","link":"https:\/\/contreras.artfosdev.com\/en\/cpf-interconnecting-services-sourcing-package\/","title":{"rendered":"CPF &#8211; INTERCONNECTING SERVICES SOURCING PACKAGE"},"content":{"rendered":"<figure>\n<table>\n<tbody>\n<tr>\n<td><strong>Project:<\/strong><\/td>\n<td>CPF &#8211; INTERCONNECTING SERVICES SOURCING PACKAGE<\/td>\n<\/tr>\n<tr>\n<td><strong>Client:<\/strong><\/td>\n<td>SHELL&nbsp;<\/td>\n<\/tr>\n<tr>\n<td><strong>Location:<\/strong><\/td>\n<td>Sierras Blancas \/ Cruz de Lorena \/ Coir\u00f3n Amargo Sur Oeste Blocks, Vaca Muerta Field, Neuqu\u00e9n&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n<p><!-- \/wp:post-content --><!-- wp:paragraph --><\/p>\n<p><strong>Description<\/strong>:<\/p><p style=\"margin: 0cm 18pt 0cm 0cm; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">Civil works associated with pipe supports, electrical systems, instrumentation, control systems, and walkways and operating platforms within the scope.&nbsp;\n<o:p><\/o:p><\/p><p style=\"margin: 0cm 18pt 0cm 0cm; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">Supply of construction materials and consumables, according to scope.<o:p><\/o:p><\/p><p style=\"margin: 0cm 18pt 0cm 0cm; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">Cementitious grout associated with anchoring of equipment to be installed.<o:p><\/o:p><\/p><p style=\"margin: 0cm 18pt 0cm 0cm; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">Waterproofing of tank containment areas.<o:p><\/o:p><\/p><p style=\"margin: 0cm 18pt 0cm 0cm; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">Installation of process equipment.<o:p><\/o:p><\/p><p style=\"margin: 0cm 18pt 0cm 0cm; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">Installation of piping modules.<o:p><\/o:p><\/p><p style=\"margin: 0cm 18pt 0cm 0cm; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">Installation of flare system off-site and its guying structures. <o:p><\/o:p><\/p><p style=\"margin: 0cm 18pt 0cm 0cm; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">3D scanning survey of installed equipment and modules. <o:p><\/o:p><\/p><p style=\"margin: 0cm 18pt 0cm 0cm; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">Correction of isometrics and adjustments according to mechanical installation. <o:p><\/o:p><\/p><p style=\"margin: 0cm 18pt 0cm 0cm; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">Construction of interconnecting piping between equipment and modules along the pipe rack route. <o:p><\/o:p><\/p><p style=\"margin: 0cm 18pt 0cm 0cm; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">Installation of off-skid instruments.<o:p><\/o:p><\/p><p style=\"margin: 0cm 18pt 0cm 0cm; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">Installation of cable trays and conduits. <o:p><\/o:p><\/p><p style=\"margin: 0cm 18pt 0cm 0cm; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">Non-destructive testing (NDT) in workshop.<o:p><\/o:p><\/p><p style=\"margin: 0cm 18pt 0cm 0cm; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">Pneumatic testing of installed lines.<o:p><\/o:p><\/p><p style=\"margin: 0cm 18pt 0cm 0cm; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">Testing and commissioning activities.<\/p><p style=\"margin: 0cm 18pt 0cm 0cm; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial;\">Start-up (PEM).<\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p><!-- \/wp:paragraph --><!-- wp:paragraph --><\/p>\n<p><strong>Execution Period:<\/strong>december 2019 - july 2020<\/p>\n<p><!-- \/wp:paragraph --><\/p>","protected":false},"excerpt":{"rendered":"<p>Proyecto: CPF &#8211; INTERCONNECTING SERVICES SOURCING PACKAGE Cliente: SHELL&nbsp; Localizaci\u00f3n: Sierras Blancas\/ Cruz de Lorena\/ Coiron Amargo Sur Oeste Blocks, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1419,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"class_list":["post-1613","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plantas-compresoras"],"_links":{"self":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts\/1613","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/comments?post=1613"}],"version-history":[{"count":5,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts\/1613\/revisions"}],"predecessor-version":[{"id":1619,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts\/1613\/revisions\/1619"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/media\/1419"}],"wp:attachment":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/media?parent=1613"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/categories?post=1613"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/tags?post=1613"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}