{"id":517,"date":"2024-03-05T03:38:22","date_gmt":"2024-03-05T03:38:22","guid":{"rendered":"https:\/\/contreras.artfosdev.com\/?p=517"},"modified":"2024-03-05T03:38:23","modified_gmt":"2024-03-05T03:38:23","slug":"planta-compresora-media-presion-bateria-ss-4-yacimiento-san-sebastian","status":"publish","type":"post","link":"https:\/\/contreras.artfosdev.com\/en\/planta-compresora-media-presion-bateria-ss-4-yacimiento-san-sebastian\/","title":{"rendered":"Compressor Plant \u2013 SS4 Medium Pressure Battery \u2013 San Sebasti\u00e1n Field"},"content":{"rendered":"<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Project:<\/strong><\/td><td>Compressor Plant \u2013 SS4 Medium Pressure Battery \u2013 San Sebasti\u00e1n Field<\/td><\/tr><tr><td><strong>Client:<\/strong><\/td><td>PAN AMERICAN FUEGUINA S.A.<\/td><\/tr><tr><td><strong>Location:<\/strong><\/td><td>Tierra del Fuego Province, ARGENTINA<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Description<\/strong>:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Engineering, construction and commissioning of three 1,500 HP gas motor compressors at the SS4 Medium Pressure Battery San Sebasti\u00e1n compressor plant.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Execution Period:<\/strong>: December 2001 - June 2002<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"299\" height=\"267\" src=\"https:\/\/contreras.artfosdev.com\/wp-content\/uploads\/2024\/03\/5.jpg\" alt=\"\" class=\"wp-image-518\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"299\" height=\"267\" src=\"https:\/\/contreras.artfosdev.com\/wp-content\/uploads\/2024\/03\/6.jpg\" alt=\"\" class=\"wp-image-519\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"299\" height=\"267\" src=\"https:\/\/contreras.artfosdev.com\/wp-content\/uploads\/2024\/03\/7.jpg\" alt=\"\" class=\"wp-image-520\"\/><\/figure>","protected":false},"excerpt":{"rendered":"<p>Proyecto: Planta Compresora &#8211; Media Presi\u00f3n Bater\u00eda SS 4 \u2013 Yacimiento San Sebasti\u00e1n Cliente: PAN AMERICAN FUEGUINA S.A. Localizaci\u00f3n: Provincia [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":518,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"class_list":["post-517","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-plantas-compresoras"],"_links":{"self":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts\/517","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/comments?post=517"}],"version-history":[{"count":1,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts\/517\/revisions"}],"predecessor-version":[{"id":521,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts\/517\/revisions\/521"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/media\/518"}],"wp:attachment":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/media?parent=517"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/categories?post=517"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/tags?post=517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}