{"id":631,"date":"2024-03-10T15:22:04","date_gmt":"2024-03-10T15:22:04","guid":{"rendered":"https:\/\/contreras.artfosdev.com\/?p=631"},"modified":"2024-08-22T21:39:01","modified_gmt":"2024-08-22T21:39:01","slug":"planta-de-cal-n3-movimiento-de-suelos-fundaciones-de-hormigon-armado-y-montaje-electromecanico","status":"publish","type":"post","link":"https:\/\/contreras.artfosdev.com\/en\/planta-de-cal-n3-movimiento-de-suelos-fundaciones-de-hormigon-armado-y-montaje-electromecanico\/","title":{"rendered":"Lime Plant No. 3 - Soil movement, reinforced concrete foundations and \nelectromechanical assembly"},"content":{"rendered":"<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Project:<\/strong><\/td><td>Lime Plant No. 3 - Soil movement, reinforced concrete foundations and \nelectromechanical assembly<\/td><\/tr><tr><td><strong>Client:<\/strong><\/td><td>SALES DE JUJUY S.A.<\/td><\/tr><tr><td><strong>Location:<\/strong><\/td><td>Jujuy Province, ARGENTINA<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Description<\/strong>:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Execution of soil movement, equipment foundations, reinforced concrete pavements and complete electromechanical assembly of Lime Plants No. 3 and No. 4, including pneumatic truck unloading system, lime silo, transfer tanks and slurry conditioning tanks of lime, its pumps and associated pipes, with its electrical power and instrumentation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Execution Period:<\/strong>May 2021 - November 2022<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"299\" height=\"267\" src=\"https:\/\/contreras.artfosdev.com\/wp-content\/uploads\/2024\/03\/01-1.jpg\" alt=\"\" class=\"wp-image-632\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"299\" height=\"267\" src=\"https:\/\/contreras.artfosdev.com\/wp-content\/uploads\/2024\/03\/02.jpg\" alt=\"\" class=\"wp-image-633\"\/><\/figure>","protected":false},"excerpt":{"rendered":"<p>Proyecto: Planta de Cal N\u00b03 -Movimiento de suelos, fundaciones de hormig\u00f3n armado y montaje electromec\u00e1nico Cliente: SALES DE JUJUY S.A. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":632,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"class_list":["post-631","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-obras-y-servicios-para-la-mineria"],"_links":{"self":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts\/631","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/comments?post=631"}],"version-history":[{"count":4,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts\/631\/revisions"}],"predecessor-version":[{"id":1391,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts\/631\/revisions\/1391"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/media\/632"}],"wp:attachment":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/media?parent=631"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/categories?post=631"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/tags?post=631"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}