{"id":729,"date":"2024-03-11T21:29:08","date_gmt":"2024-03-11T21:29:08","guid":{"rendered":"https:\/\/contreras.artfosdev.com\/?p=729"},"modified":"2024-03-11T21:29:58","modified_gmt":"2024-03-11T21:29:58","slug":"corredor-vial-nacional-n-2","status":"publish","type":"post","link":"https:\/\/contreras.artfosdev.com\/en\/corredor-vial-nacional-n-2\/","title":{"rendered":"National Road Corridor No. 2"},"content":{"rendered":"<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Project:<\/strong><\/td><td>National Road Corridor No. 2<\/td><\/tr><tr><td><strong>Client:<\/strong><\/td><td>DIRECCION NACIONAL DE VIALIDAD<\/td><\/tr><tr><td><strong>Location:<\/strong><\/td><td>La Pampa and Buenos Aires Provinces, ARGENTINA<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Description<\/strong>:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Construction, repair, conservation, expansion, remodeling, administration and exploitation construction works through the toll concession system of National Routes No. 5, No. 188 and Provincial Route No. 35. Total length: 769 km.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Special Characteristics:<\/strong>&nbsp;The continuous improvement management, a pioneer in road activity in the area, has given optimal results in accident prevention.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Execution Period:<\/strong>: April 2010 - December 2012<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"299\" height=\"267\" src=\"https:\/\/contreras.artfosdev.com\/wp-content\/uploads\/2024\/03\/121.jpg\" alt=\"\" class=\"wp-image-730\"\/><\/figure>","protected":false},"excerpt":{"rendered":"<p>Proyecto: Corredor Vial Nacional N\u00b0 2 Cliente: DIRECCION NACIONAL DE VIALIDAD Localizaci\u00f3n: Provincias Buenos Aires y La Pampa, ARGENTINA Descripci\u00f3n: [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":730,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[],"class_list":["post-729","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-obras-viales-y-ferroviarias"],"_links":{"self":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts\/729","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/comments?post=729"}],"version-history":[{"count":2,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts\/729\/revisions"}],"predecessor-version":[{"id":732,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/posts\/729\/revisions\/732"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/media\/730"}],"wp:attachment":[{"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/media?parent=729"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/categories?post=729"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/contreras.artfosdev.com\/en\/wp-json\/wp\/v2\/tags?post=729"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}